    摘要:

    以南昌地铁四号线某深基坑的实测资料为基础,运用FLAC3D软件模拟深基坑开挖的全过程,分别从不同管材、管径、埋深、埋距及有无内支撑条件下分析基坑开挖对临近管线的位移变化规律。研究结果表明:内支撑在基坑施工过程中对临近管线的位移起到良好的限制作用;管线因素的影响作用主要集中在基坑开挖深度的前6m,6m后管线的变形逐步趋于稳定;管材材料刚度在基坑开挖过程中对管线位移的影响明显,刚度越大,管线的沉降位移量越小;改变管径对管线沉降位移的影响作用较水平位移更为显著,且管径因素对管线沉降位移的影响要大于管材因素对管线沉降位移的影响;管线在埋深为10m时沉降位移为零且管线水平位移最大,推测在埋深10m处的地下连续墙处于形变的至高点,需要加强相关的监测与保护;管线在距离基坑20m处依然存在近1mm的水平位移,得出基坑开挖对临近管线的水平位移影响范围大于其沉降位移影响范围。

    Abstract:

    Based on the measured data of a deep foundation pit of Nanchang Metro Line 4, FLAC3 D software is used to simulate the whole process of deep foundation pit excavation. The displacement variation law of adjacent pipelines caused by foundation pit excavation is analyzed from different pipe materials, pipe diameters, buried depths, buried distances and with or without internal supports. The results show that the internal support plays a good role in limiting the displacement of the adjacent pipeline during the construction of the foundation pit. The influence of pipeline factors is mainly concentrated in the first 6m of the excavation depth of the foundation pit, and the deformation of the pipeline gradually tends to be stable after 6m; the stiffness of pipe material has obvious influence on the displacement of pipeline in the process of foundation pit excavation. The larger the stiffness is, the smaller the settlement displacement of pipeline is. The influence of changing pipe diameter on pipeline settlement displacement is more significant than that of horizontal displacement, and the influence of pipe diameter on pipeline settlement displacement is greater than that of pipe material on pipeline settlement displacement. When the buried depth of the pipeline is 10 m, the settlement displacement is zero and the horizontal displacement of the pipeline is the largest. It is speculated that the underground continuous wall at the buried depth of 10 m is at the highest point of deformation, and relevant monitoring and protection need to be strengthened. The pipeline still has a horizontal displacement of nearly 1mm at a distance of 20 m from the foundation pit. It is concluded that the influence range of foundation pit excavation on the horizontal displacement of adjacent pipelines is greater than that of its settlement displacement.