when drilled grouting plie eancounter civil air defense shelter,authors adopted the construction plan of concrete pil casing,it guarantee the project times and quality,satisfying the design requirement.
参考文献
相似文献
引证文献
引用本文
余学文; 包忠有.混凝土材料损伤协同演化及其热弹性不稳定性[J].华东交通大学学报,2006,23(1):12-15. . Construction Technology of Drilled Grouting Pile Encounter Civil Air Defense Shelter[J]. JOURNAL OF EAST CHINA JIAOTONG UNIVERSTTY,2006,23(1):12-15