Based on the analysis of in-situ monitoring data and the numerical simulation of the deformation of Sheng-hong-qing tunnel along Wujiu railway,it is testified that using back fill along riverside to prevent the creep is reasonable.Moreover,the method of tunnel construction monitor is put up,which has a significant guide to the tunnel construction.
参考文献
相似文献
引证文献
引用本文
李丽; 王全金.人工湿地在污水处理中的研究进展[J].华东交通大学学报,2007,24(1):11-14. . Monitoring and Numerical Simulation on the Deformation of Sheng-hong-qing Tunnel[J]. JOURNAL OF EAST CHINA JIAOTONG UNIVERSTTY,2007,24(1):11-14