In this paper,new construction plan of concrete filled steel tube is put forward.And the method of lift and assemble of concrete filled steel tube arch that hang steel tube with no-end cable and hang transverse girder with strut of arch rib is described detail.And it is proved through an example that if concrete filled steel tube arch hanged with this method,the weight of hanging will be reduced,and the fee of lift and assembly will be cut down.
参考文献
相似文献
引证文献
引用本文
马莉莎; 姜忠爱.世界渔船发展概况[J].华东交通大学学报,2007,24(1):49-52. . Research on High Active and Cheap Method for Lifting and Assembling of Concrete Filled Steel Tube Arch Bridge[J]. JOURNAL OF EAST CHINA JIAOTONG UNIVERSTTY,2007,24(1):49-52