Abstract:In this paper,new construction plan of concrete filled steel tube is put forward.And the method of lift and assemble of concrete filled steel tube arch that hang steel tube with no-end cable and hang transverse girder with strut of arch rib is described detail.And it is proved through an example that if concrete filled steel tube arch hanged with this method,the weight of hanging will be reduced,and the fee of lift and assembly will be cut down.