Research on High Active and Cheap Method for Lifting and Assembling of Concrete Filled Steel Tube Arch Bridge
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU37

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In this paper,new construction plan of concrete filled steel tube is put forward.And the method of lift and assemble of concrete filled steel tube arch that hang steel tube with no-end cable and hang transverse girder with strut of arch rib is described detail.And it is proved through an example that if concrete filled steel tube arch hanged with this method,the weight of hanging will be reduced,and the fee of lift and assembly will be cut down.

    Reference
    Related
    Cited by
Get Citation

马莉莎; 姜忠爱.世界渔船发展概况[J].华东交通大学学报,2007,24(1):49-52.
. Research on High Active and Cheap Method for Lifting and Assembling of Concrete Filled Steel Tube Arch Bridge[J]. JOURNAL OF EAST CHINA JIAOTONG UNIVERSTTY,2007,24(1):49-52

Copy
Related Videos

Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:December 18,2006
  • Revised:
  • Adopted:
  • Online:
  • Published:
Article QR Code