Research on Method of New Turn Ramp for Urban Partial Interchange
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U412.3

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper studies the relationship between the additional confluence of semi-interchange and the ex- isting interchange diversion ramps, presents the full interchange ramp number and calculation formula of combi- nation number for the new off and on ramps and layout and scheme selection points of the adding ramps. In ad- dition, it provides a concrete example of added turning ramps with three-way, four-way and five-way intersec- tion roads. By taking Shenzhuang Interchange in Shanghai as an example, it conducts empirical research.

    Reference
    Related
    Cited by
Get Citation

彭庆艳.城市部分互通立交增设转向匝道方法研究[J].华东交通大学学报英文版,2018,35(3):29-34.
Peng Qingyan. Research on Method of New Turn Ramp for Urban Partial Interchange[J]. JOURNAL OF EAST CHINA JIAOTONG UNIVERSTTY,2018,35(3):29-34

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 25,2021
  • Published:
Article QR Code