Survey and Analysis of Park and Ride in Periphery of Nanchang Rail Transit Line
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

U491

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    This paper investigated the actual parking situation along the rail transit Line No.1, rail transit travel of citizens, and vehicle speed at central and suburb areas. Besides, it adopted the method of qualitative and quantitative analysis to identify the feasibility of park and ride (P&R)by drawing on experience of both domestic and foreign urban construction. The research results show that Nanchang city would have basic P&R construction condition when the network is formed with two or three rail lines in the near future. Based on a case study in Changbei suburban area, this paper proposes that the method of disaggregate Logit model to predict the parking demand is practical and feasible. P&R construction land should be well reserved or controlled during the period of rail transit construction. Some concrete construction suggestions on P&R are put forward accordingly.

    Reference
    Related
    Cited by
Get Citation

艾瑶,曾灿,张兵.南昌轨道交通沿线外围停车换乘建设分析[J].华东交通大学学报英文版,2018,35(4):60-67.
Ai Yao, Zeng Can, Zhang Bing. Survey and Analysis of Park and Ride in Periphery of Nanchang Rail Transit Line[J]. JOURNAL OF EAST CHINA JIAOTONG UNIVERSTTY,2018,35(4):60-67

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 26,2021
  • Published:
Article QR Code