Study on Pile Underpinning and Removing Technology of Shield Tunnel Crossing Through Pile Foundations of Road Bridge
DOI:
CSTR:
Author:
Affiliation:

Clc Number:

TU43

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    Taking one shield tunnel crossing through the bridge viaduct pile foundation of a metro as the engi- neering background, this study analyzed pile underpinning and removing technology of the shield tunnel crossing in such a complex environment. It solved the technical difficulties in the process of underpinning, such as wa- ter-proof performance, stability of structure and tool modification of cutter head. At the same time, the construc- tion process of underpinning pile was simulated by plane strain calculation model. The results show that the maximum settlements of bridge piers and underpinning pile were all in the scope of the early warning, the con- ditions of this underpinning pile engineering were very complicated and the displacement control was very strict. Through the research and analysis of the construction scheme, it proves that the construction method is feasible with a high standard, which can provide certain engineering reference for similar projects.

    Reference
    Related
    Cited by
Get Citation

吴凡.盾构下穿高架桥桩基的托换施工技术分析[J].华东交通大学学报英文版,2019,36(2):15-21.
Wu Fan. Study on Pile Underpinning and Removing Technology of Shield Tunnel Crossing Through Pile Foundations of Road Bridge[J]. JOURNAL OF EAST CHINA JIAOTONG UNIVERSTTY,2019,36(2):15-21

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 31,2021
  • Published:
Article QR Code