Research on Carbon Payback Period of Urban Rail Transit Project Based on Carbon Footprint
CSTR:
Author:
Affiliation:

Clc Number:

U292;F572

Fund Project:

  • Article
  • |
  • Figures
  • |
  • Metrics
  • |
  • Reference
  • |
  • Related
  • |
  • Cited by
  • |
  • Materials
  • |
  • Comments
    Abstract:

    In order to study the environmental benefits of urban rail transit projects brought by carbon emission reduction, construction and operation data were integrated to construct a carbon payback period calculation model for urban rail transit projects. Taking 5 rail transit lines in Changsha city as the research object, based on a reasonable forecast of future passenger traffic, the carbon footprint changes of these 5 lines during construction and operation from 2014 to 2050 were quantitatively analyzed. It is found that the urban rail transit project has significant carbon emission reduction benefits. All five lines can fully recover the carbon emissions of the construction stage by 2050, and afterwards, carbon emissions trading will also generate positive benefits. At the same time, it maintains that the carbon emission reduction benefits of rail transit projects are directly affected by the saturation of passenger traffic.

    Reference
    Related
    Cited by
Get Citation

张跃斌,易欣,李双双,邱慧,宋璋玉.基于碳足迹的城市轨道交通项目碳回收期研究[J].华东交通大学学报英文版,2022,39(2):77-85.
Zhang Yuebin, Yi Xin, Li Shuangshuang, Qiu Hui, Song Zhangyu. Research on Carbon Payback Period of Urban Rail Transit Project Based on Carbon Footprint[J]. JOURNAL OF EAST CHINA JIAOTONG UNIVERSTTY,2022,39(2):77-85

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 21,2022
  • Published:
Article QR Code