    Abstract:

    The use of double-row steel pipe pile cofferdams in subsea engineering is gradually increasing, but there is less analysis on the influence of cofferdam parameters on the deformation and force of steel pipe piles. The calculated results are compared with the measured results to verify the reasonableness of the finite element model. By studying the influence of pile distance on the force deformation of steel pipe pile cofferdam, it is concluded that with the simultaneous increase of double-row pile distance, the internal force deformation of steel pipe pile increases, and then slow down. The pile distance increases by the same magnitude, and the influence of the outer pile distance on the cofferdam is greater than the increase of the inner pile distance. When the number of piles is certain, increasing the outer row pile distance can control the deformation more effectively than evenly distributed steel pipe piles. This paper may provide reference for the design and construction of similar projects.

    Reference
    Related
    Cited by
Get Citation

袁聪聪,詹刚毅,侯世磊,江平,章立辰,黄展军.桩距对双排钢管桩围堰的受力变形影响分析[J].华东交通大学学报英文版,2022,39(2):45-52.
Yuan Congcong, Zhan Gangyi, Hou Shilei, Jiang Ping, Zhang Lichen, Huang Zhanjun. Influence of Pile Distance on Force Deformation of Double-Row Steel Pipe Pile Cofferdam[J]. JOURNAL OF EAST CHINA JIAOTONG UNIVERSTTY,2022,39(2):45-52

Copy
Share
Article Metrics
  • Abstract:
  • PDF:
  • HTML:
  • Cited by:
History
  • Received:
  • Revised:
  • Adopted:
  • Online: May 21,2022
  • Published:
Article QR Code